Jun 7, 2010

Traffic on the field...


It can be very narrow with space sometimes out here at Valhall Oil Field. But with mordern equipment as the DP System (Dynamic positioning) on every ship it is not much of a problem to lay as close as 15 - 30 meters away form each other to do a job. Today we are four ships in the total doing driffrent typs of jobs and figthing for space with in the 500 meter zone. This zone is all so seen on the oil platforms saftey zone and ships should only be within this area if they really need to...  

Jun 5, 2010

Transferes

I går lå vi ikkje mye stille... vi fraktet transfer hiv fram og tilbake mellom installasjonene meste parten av dagen. Routing; WP - Regalia - WP - PCP - VFS - VFN - QP - DP - IP hehehe... (Se bilder)


Etter alt transfer kjøringen og vi hadde stoppet ned hoved maskineriet og trudde at det var stilt for kvelden. Fekk vi melding om